The Victor Elementary School District is committed to upgrading all District environmental controls equipment with new energy efficient HVAC units and EMS controls to exceed current T-24 Code standards. Consistent with Proposition 39 recommendations, the District HVAC Retrofit project encompasses the “change-out” of existing HVAC equipment to 50 High Efficiency Gas-Electric Roof Mount (15 SEER) units and 58 Wall Pack Electric Heat Pump (15 SEER) units at the District’s first two campuses (Mojave VistaNillage Elementary Schools). The District initially requested the use of Ultra High Efficiency (20 SEER) roof mount units, but at an added $9,400 per unit, the District opted to change to the 15 SEER alternative. The EMS controls were upgraded to “Carrier Open Control” global web-based system by Russell Sigler Controls Group.

About Project

Given a strict budget of $2 million, including soft costs, furnishings, and equipment, the building was designed within modular building dimensions. Evidence includes a separate lab area and cold storage room. Fixed shelving was installed for evidence storage. Pass through lockers and a refrigerated evidence locker are also included in the evidence drop-off area.

  • Estimated Cost$1.52 Million
  • Construction Cost$1,515,480
  • Square FootageNot Applicable
  • Cost Per Unit:$13,650
  • Construction Duration4 Months
  • Completion DateAugust 2014
  • PrincipalJonathan Clarke
  • Sr. Project ManagerMike Woods
  • Superintendent Mike Woods
  • Delivery MethodCM/Multi-Prime

Education & Civic Construction Supervision

Leading the way in Construction Management

WLC Corporate Headquarters WLC Architects, Inc. / California Professional Management, Inc.

ALFC Classroom Building Addition Abundant Living Family Church

Door Components Manufacturing Headquarters – Door Components, Inc.